| |
In
replacing old style pre-cast concrete “Block & Beam”
systems with this Modern Method of Construction site activity
is reduced by 80%.
However well managed the site safety, these old systems have
elements of risk from concrete cutting, high speed tools,
dust, noise, heavy plant, equipment and heavy manual labour,
these risks are removed improving a site operative’s
health and safety. |
|